Electrostatic Precipitators at Power Plant

Project Description:

Electra M&E Polska, acting as a subcontractor of GE Power, will prepare design documentation and supply HVAC systems as part of its work on power blocks #5 and #6 at Opole Power Plant. These new systems will be installed in the electrostatic precipitator buildings. The design phase was completed in December 2016, and the start of assembly operations is planned for February 2017.