Audi Ingolstadt and Audi Brussels

Project Description:

Following the construction of the new Volkswagen Crafter factory in Września, Electra M&E Polska is successfully continuing its cooperation with the Volkswagen Group by supplying and assembling ventilation systems for Audi factories in Ingolstadt and Brussels. In addition to assembly operations, the contract covers preparation of detailed engineering documentation for the contracted work. The Brussels project also includes installation work required for the renovation of the L1/2 HRK manufacturing hall and will be executed between March and July 2017. The Ingolstadt contract covers installation of general ventilation systems and smoke removal ductworks in the newly constructed, three-level manufacturing hall N60.3. Assembly operations will be performed between June 2017 and March 2019.